Complete on site. Parts 3a / 3b / 3c — fill whichever applies to the installed system.
1.1 — Installation Address
1.2 — System Classification
Units / Systems Installed
Select the VENTI product from the dropdown. Add as many units as required.
1.3 — Installation Engineer
1.4 — Commissioning Engineer
Dwelling Parameters — Whole-Dwelling Ventilation Check
| Installation check | Response |
|---|---|
| Installed per manufacturer's requirements? | |
| ADF(1) paragraphs 1.74–1.87 followed (ducting, insulation, terminals, inspection)? | |
| Any deviations from paragraphs 1.74–1.87 — documented? |
| Inspection item — all systems | Response |
|---|---|
| Background ventilator quantity and equivalent area meets ADF(1) (Table 1.7 natural vent.; para 1.64 continuous MEV)? | |
| All background ventilators left in open position? | |
| Correct number and location of extract terminals — satisfy Table 1.1 or 1.2? | |
| Installation complete — no obvious defects? | |
| Internal doors have sufficient undercut — 10mm above floor finish or 20mm above bare floor surface (para 1.21)? | |
| All protective packaging removed (including from background ventilators)? | |
| All systems clean internally and externally? | |
| System installed to allow maintenance access and component replacement? |
2b.3 — Other inspections
| Check | Response |
|---|---|
| At initial start-up: any abnormal sound, vibration or unusual smell? | |
| During continuous operation: any excessive noise? |
Ducted systems — continuous MEV / MVHR additional checks
| Additional inspection item — ducted systems | Response |
|---|---|
| Appropriate air terminal devices installed to allow system balance? | |
| Heat recovery unit and all ductwork effectively insulated and sealed — heated and unheated spaces? | |
| Condensate connection complete and draining correctly? (MVHR / srMVHR only) | |
| Filters installed? | |
| Ductwork installed to minimise air resistance and leakage? |
3a.1 — Commissioning Equipment (UKAS calibrated)
| Device model & serial number | UKAS calibration date | Certificate no. |
|---|---|---|
3a.2 — Airflow Measurements
| Room type | ADF(1) min. (l/s) | Design rate (l/s) | Measured (l/s) | Status |
|---|
For cooker hoods, record highest setting only.
3b.1 — Commissioning Equipment (UKAS calibrated)
| Device model & serial number | UKAS calibration date | Certificate no. |
|---|---|---|
3b.2 — Airflow Measurements (Extract)
| Room type | ADF(1) high rate min. | Measured high rate (l/s) | Status | Measured continuous (l/s) |
|---|---|---|---|---|
| Total continuous rate (all units) | → whole-dwelling | 0.00 l/s | ||
3c.1 — Commissioning Equipment (UKAS calibrated)
| Device model & serial number | UKAS calibration date | Certificate no. |
|---|---|---|
3c.2 — Extract Airflow Measurements
| Room type | ADF(1) min. high rate (l/s) | Design high rate (l/s) | Measured high rate (l/s) | Status | Design continuous (l/s) | Measured continuous (l/s) |
|---|---|---|---|---|---|---|
| Total extract continuous rate | → whole-dwelling | 0.00 l/s | ||||
3c.3 — Supply Airflow Measurements (MVHR / srMVHR only — leave blank for MEV / dMEV)
| Room type | Design high rate (l/s) | Measured high rate (l/s) | Design continuous (l/s) | Measured continuous (l/s) |
|---|---|---|---|---|
| Total supply continuous | — | — | — | 0.00 l/s |
Generated by VENTI Commissioning Tool v1.3.0