Appendix C Commissioning Certificate Form
Completion Checklist & Commissioning Sheet
VENTI commissioning tool — complete on site, download as Building Control certificate
Property & System Details
Installation Address
Dwelling Parameters
1.3 — Installation Engineer
1.4 — Commissioning Engineer
Controls
Units / Systems Installed
Select each VENTI unit installed. Add as many rows as required.
2a — Installation Details
2b — Visual Inspection
2b.3 — Start-up & operation checks
Ducted systems — continuous MEV / MVHR additional checks
Commissioning Equipment
| Device model & serial number | UKAS calibration date | Certificate no. |
|---|---|---|
Report always outputs l/s per Approved Document F
Part 3a — Intermittent Extract Fan Testing
| Room type | ADF(1) min. | Design rate | Measured | Status |
|---|
Part 3b — dMEV Commissioning
| Room type | ADF(1) high min. | Measured high | Status | Measured cont. |
|---|---|---|---|---|
| Total continuous rate | WDV → | 0.00 l/s | ||
Part 3c — Centralised MEV / MVHR / srMVHR
Extract terminals
| Room type | ADF(1) min. | Design high | Measured high | Status | Design cont. | Measured cont. |
|---|---|---|---|---|---|---|
| Total extract continuous | WDV → | 0.00 l/s | ||||
Supply terminals (MVHR / srMVHR — leave blank for MEV / dMEV)
| Room type | Design high | Measured high | Design cont. | Measured cont. |
|---|---|---|---|---|
| Total supply continuous | — | — | — | 0.00 l/s |
Declaration & Review
Engineer's Declaration
By generating this record, I confirm that the ventilation system at the above address has been installed, inspected, tested and commissioned in accordance with Approved Document F, Volume 1, Appendix C, and that the measured airflow rates are as recorded.
Fields marked * are required. The PDF is suitable for Building Control submission.
Group
Appendix C Commissioning Certificate
Approved Document F, Volume 1 — ventilation commissioning record