VENTI commissioning tool — complete on site, download as Building Control certificate
Select each VENTI unit installed. Add as many rows as required.
2b.3 — Start-up & operation checks
Ducted systems — continuous MEV / MVHR additional checks
| Device model & serial number | UKAS calibration date | Certificate no. |
|---|---|---|
Report always outputs l/s per Approved Document F
| Room type | ADF(1) min. | Design rate | Measured | Status |
|---|
| Room type | ADF(1) high min. | Measured high | Status | Measured cont. |
|---|---|---|---|---|
| Total continuous rate | WDV → | 0.00 l/s | ||
Extract terminals
| Room type | ADF(1) min. | Design high | Measured high | Status | Design cont. | Measured cont. |
|---|---|---|---|---|---|---|
| Total extract continuous | WDV → | 0.00 l/s | ||||
Supply terminals (MVHR / srMVHR — leave blank for MEV / dMEV)
| Room type | Design high | Measured high | Design cont. | Measured cont. |
|---|---|---|---|---|
| Total supply continuous | — | — | — | 0.00 l/s |
By generating this record, I confirm that the ventilation system at the above address has been installed, inspected, tested and commissioned in accordance with Approved Document F, Volume 1, Appendix C, and that the measured airflow rates are as recorded.
Fields marked * are required. The PDF is suitable for Building Control submission.
Approved Document F, Volume 1 — ventilation commissioning record
Last Updated on 28 April 2026 by Bradley Pallister